Installation method of computer jacquard faucet
1. Preparation before installation
Tool preparation: Prepare the necessary tools for installation, such as screwdrivers, wrenches, level gauges, etc.
Component inspection: Check whether the computer jacquard faucet and its accessories are complete, without damage or missing.
.Installation position determination: Determine the installation position of the computer jacquard faucet based on the model and specifications of the loom.
. Ensure that the installation position is flat, stable, and easy to operate and maintain.2. Installation steps
Fix the faucet wall panel:
Place the faucet wall panel in the predetermined position and adjust its levelness using a spirit level.
.Use a screwdriver or wrench to secure the faucet wall panel to the loom, ensuring it is firm and reliable.
.Install solenoid valve pressure block and solenoid valve:
Install the solenoid valve pressure block axially through the upper baffle on the inner side of the faucet wall panel.
.Fix the solenoid valve on the solenoid valve pressure block, ensuring that the solenoid valve is tightly connected to the pressure block.
.Install the swing arm mechanism and linkage mechanism:
Connect the swing arm mechanism on both outer sides of the faucet wall panel.
. Connect the linkage mechanism to the swing arm mechanism to ensure that the swing arm mechanism can move up and down. Adjust the position and angle of the swing arm mechanism and linkage mechanism to make their movement flexible and smooth.Install the knife lifting mechanism:
Set up a knife lifting mechanism that is horizontally distributed vertically at the corresponding position of the solenoid valve.
.Connect the lifting mechanism and the connecting rod mechanism axially in a staggered manner to ensure that the lifting mechanism can move up and down with the swing arm mechanism.
. Adjust the position and angle of the lifting mechanism to ensure it fits well with other components of the loom.Installing the driving device:
Install the driving device at one end of the faucet transmission shaft, such as a step wheel and motor.
. Connect the driving device to the swing arm mechanism to ensure that the driving device can drive the swing arm mechanism to move. Adjust the parameters and settings of the driving device to meet the operational requirements of the loom.Connect the electrical system:
Connect the electrical system of the computerized jacquard faucet to the control system of the loom.
. Ensure that the electrical connections are correct, secure, and free from short circuits or open circuits. Perform electrical system debugging and testing to ensure its normal operation.III. Inspection and Debugging After Installation
Check Installation Quality:
Check whether the various components of the computer jacquard faucet are installed firmly and reliably.
. Check if the electrical connections are correct, free from looseness or short circuits.Check if the moving parts are flexible, stable, and free of jamming or abnormal noise.
. Debugging and testing: Conduct no-load debugging and testing on the computer jacquard faucet, observe its movement and performance indicators. Adjust and optimize according to the debugging and testing results to ensure that the computerized jacquard faucet meets the operational requirements of the loom. Perform load debugging and testing to further verify the performance and stability of the computerized jacquard faucet.