您好!欢迎光临Xianyang Keyuan New Materials Equipment官方网站!
新闻动态
产品展示
联系我们

Xianyang Keyuan New Materials Equipment Co., Ltd

地   址:210 Yuquan West Road, Qindu District, Xianyang City, Shaanxi Province

联系人:Manager Chen

电   话:13720777965

微   信:13992091608

新闻详情 当前位置:首页 > Industry Information > Operating procedures for laboratory rotary furnaces

Operating procedures for laboratory rotary furnaces
 日期:2021/12/23 14:31:00 

<

3: Start the machine, set the initial temperature of the temperature controller to 80 degrees Celsius, connect the power to the burner, open the main valve and combustion valve of the gas outdoor pipeline, rotate the remote ignition switch to the ignition position for ignition, and observe in a timely manner that the interval between ignition times should not be less than 5 minutes. Determine whether the ignition is successful, and strictly prohibit the second ignition if the interval is too short or the reason for the first ignition failure is not found.

相关标签:Laboratory rotary furnace, rotary furnace, rotary furnace equipment,